WATER & ENVIRONMENT
Karun River
Dredging studies, river improvement, bank protection and supervision across different reaches of the Karun.
Dredging Studies & Supervision
Assignments include dredging studies for the Farsiat reach and the Chanibieh–Moran reach, studies downstream of Ahvaz, supervision between the Fifth Bridge and Lower Chanibieh, and third-stage engineering services for dredging at Khorramshahr.
River Improvement & Bank Protection
Other assignments address navigation feasibility, river improvement for water transport, erosion control near a treatment plant and bank protection around material-extraction pits near Gotvand.
Assignments by Reach
مطالعات فاز 2 لایروبی کارون بازه فارسیات
Assignment reference: WE054
انجام بخشي از خدمات مطالعات و طراحي مرحله دوم عمليات لايروبي كارون بازه چنيبيه تا موران
Assignment reference: WE064
پروژه كنترل فرسايش جانبي رودخانه كارون در محل تصفيه خانه
Assignment reference: WE070
پروژه مطالعات مرحله اول ساماندهی رودخانه كارون با هدف ترابري آبي
Assignment reference: WE080
پروژه امكان سنجي كشتيراني در رودخانه كارون
Assignment reference: WE092
پروژه مطالعات و تهيه طرح ساماندهي گودالهاي برداشت مصالح و حفاظت سواحل رودخانه كارون_ گتوند
Assignment reference: WE114
پروژه طرح ساماندهي گودال هاي برداشت مصالح و حفاظت سواحل كارون در پايين دست سد گتوند
Assignment reference: WE117
پروژه مطالعات بخشي از فاز 2 عمليات لايروبي آبراه كارون به منظور كاناليزه كردن و افزايش ظرفيت آبگذاري در پايين دست شهر اهواز
Assignment reference: WE139
پروژه عمليات لايروبي رودخانه كارون بازه پل پنجم تا چنيبيه سفلي
Assignment reference: WE143
پروژه نظارت بر اجرای ساماندهی رودخانه کارون
Assignment reference: WE175
پروژه خدمات مهندسی مرحله سوم لایروبی رودخانه کارون در خرمشهر
Assignment reference: WE202
کارفرما: سازمان آب و برق خوزستان
نظارت رودخانه کارون در محدوده پل پنجم تا پارک شقایق
Assignment reference: WE215